IN ACTIVE DEVELOPMENT · $499 · PER-PARCEL

The $499 Site Feasibility Study — launching later in 2026.

A site-specific analysis for one Hudson Valley parcel. Zoning, parcel geometry, buildable envelope, utilities, access, septic capacity, risk, cost, and schedule — pulled into one report with a clear outcome and the next steps that follow from it. The Site Feasibility Study is in active development and launches later in 2026. Join the waitlist below to be notified when it's available.

FOR HOMEOWNERS DECIDING WHETHER AN ADU IS WORTH PURSUING
WAITLIST OPEN · LAUNCHING LATER IN 2026 The service is not yet bookable. Service launch is tied to equipment acquisition and the first paid site visits. Join the waitlist below and we'll reach out as soon as scheduling opens for your area. When the service launches, the workshop fee ($99) will credit toward the study, bringing the net cost to $400.

What the study will cover at launch

One parcel, one site visit, one report. Everything in scope below is grounded in records you can verify and observations a non-licensed feasibility consultant can defensibly make. Anything that requires a stamp (boundary survey, stamped structural drawings, jurisdictional wetland delineation) will be referred to the right licensed professional rather than performed in-house.

What you'll receive when the service launches

One PDF report, planned for delivery within two to three weeks of the site visit, with all underlying records linked or referenced so you can re-pull anything yourself. The report is yours to share with your architect, builder, lender, or attorney — there's no Rootd-branded watermark that limits how you use it.

The three outcomes

Every study will land in one of three buckets. Knowing what you're signing up for means knowing the bucket you might end up in.

FEASIBLE

A real project on this parcel.

Zoning works, the site can support the build, utilities and access are workable, and the budget and timeline match the path. The report names the next steps and the right professionals to take them.

INDETERMINATE

A real path exists, but one or more questions need answers before you commit.

Common drivers: septic capacity that needs perc testing, a variance that may or may not be granted, a utility extension whose cost won't be known until you ask the utility. The report names the open questions and what each one would take to resolve.

INFEASIBLE

The project, as currently framed, does not work on this parcel.

Hard zoning prohibitions, unworkable access, infeasible utility extension, or a constraint stack that no reasonable variance path resolves. The report explains why and, where possible, names the alternatives (different unit type, attached configuration, different parcel) that would change the answer.

Join the waitlist

Be among the first contacted when the Site Feasibility Study is available. We'll email you when scheduling opens for your area and walk through next steps from there. When the service launches, workshop attendees' $99 credit applies automatically — no promo code needed.

Service area for the first wave when the study launches: Ulster, Dutchess, Greene, and Columbia counties. Waitlist signups from outside that area are welcome — we'll let you know when we can reach you.